Bottom of the swale
The County requires that the Maintenance Corp maintain a clear break between the hillside (left) and the woods / wetland (right).
The clearing is required maintain an area of erosion control between the hillside and the wooded wetlands. If trimming is not done, the forest will easily take 6 to 12 inches a year.
The To Do List:
Occasionally mow the grass path
Keep the path clear of debris and encroaching brush from both sides
Depending on time since last cut, the brush encroachment may require a brush cutter / weed wacker.
Estimated time for job - 1 -2 hours.